cut and paste multiple events works incorrectly

UNCONFIRMED
Unassigned

Status

Calendar
Lightning Only
UNCONFIRMED
4 years ago
4 years ago

People

(Reporter: b3weed, Unassigned)

Tracking

Lightning 2.6.5

Details

(Reporter)

Description

4 years ago
User Agent: Mozilla/5.0 (Windows NT 6.0; rv:29.0) Gecko/20100101 Firefox/29.0 (Beta/Release)
Build ID: 20140506152807

Steps to reproduce:

In Month view. Selected multiple events (multiple is important) all on one day, right-clicked and chose Copy. Clicked into another day, right-clicked and selected Paste.


Actual results:

Paste happens, but not on the date selected. They end up in the future about 26 days. For example I pasted into April 18th and they landed into May 14th. Pasted into April 19 and they landed into May 15th.
This does not happen when I copy and paste a single even.


Expected results:

Should have been inserted into the date I paste into.
(Reporter)

Comment 1

4 years ago
On further testing it turns out that one event of the ten events I was trying to paste is causing the problem. Even copying and pasting this single even alone will end up with it landing in the wrong date. I also note that it is a repeated event, but when I open it it does not behave like its brothers (doesn't ask about editing This One or All, for example.)
So maybe tht event is corrupt?

Here is a paste of that event:
BEGIN:VCALENDAR
PRODID:-//Mozilla.org/NONSGML Mozilla Calendar V1.1//EN
VERSION:2.0
BEGIN:VEVENT
CREATED:20140317T141912Z
LAST-MODIFIED:20140531T141558Z
DTSTAMP:20140531T141558Z
UID:3a4d8c7b-eb5d-4793-96d1-2ba30cf58e4d
SUMMARY:charge batteries (both drills\, camera\, shaver\, cell phone\, gps
 \, coby mp3)
RECURRENCE-ID;VALUE=DATE:20140503
DTSTART;VALUE=DATE:20140513
DTEND;VALUE=DATE:20140514
SEQUENCE:6
DESCRIPTION:charge batteries (both drills\, camera\, shaver\, cell phone\,
  gps\, coby mp3\, Mexico cell phone)
X-MOZ-GENERATION:6
END:VEVENT
END:VCALENDAR
You need to log in before you can comment on or make changes to this bug.