[User Story] Adjust daily budget based on data remaining in period

NEW
Unassigned

Status

Firefox OS
Gaia::Cost Control
3 years ago
3 years ago

People

(Reporter: pdol, Unassigned)

Tracking

(Blocks: 1 bug, {feature})

unspecified
x86
Mac OS X
feature

Firefox Tracking Flags

(tracking-b2g:backlog)

Details

(Whiteboard: [ucid:SMRTDATA-6-2][NaBfT])

User Story

As a cost conscious user, I want my daily budget to be adjusted every day based on the total remaining data available to me in the period divided by the days in the period so that I see an accurate representation of whether or not I'm on track with my data usage.

Acceptance Criteria:
1. The daily data limit for the Today view in the data usage dashboard (described by bug 1089958) is adjusted each day using a calculation of the total data remaining in the plan divided by the days remaining in the plan.
2. Interaction and Visual Design matches the UX spec.
Comment hidden (empty)
Whiteboard: [ucid:SMRTDATA-6-2] → [ucid:SMRTDATA-6-2][NaBfT]
(Reporter)

Updated

3 years ago
blocking-b2g: --- → backlog
feature-b2g: --- → 2.2?
(Reporter)

Updated

3 years ago
User Story: (updated)
Summary: [User Story] Adjust daily budget based on data remaining in period [DRAFT] → [User Story] Adjust daily budget based on data remaining in period
(Reporter)

Updated

3 years ago
feature-b2g: 2.2? → 2.2+
QA Contact: jlorenzo

Comment 1

3 years ago
[Tracking Requested - why for this release]:
feature-b2g: 2.2+ → ---
tracking-b2g: --- → ?
(Assignee)

Updated

3 years ago
blocking-b2g: backlog → ---
You need to log in before you can comment on or make changes to this bug.