Closed Bug 1700164 Opened 3 years ago Closed 6 months ago

Removed the "check-in-needed" option

Categories

(Conduit :: moz-phab, enhancement, P3)

enhancement

Tracking

(Not tracked)

RESOLVED FIXED

People

(Reporter: TYLin, Assigned: sheehan)

Details

(Keywords: conduit-triaged)

Attachments

(1 file)

Typing moz-phab submit -h, there's an option

--check-in-needed     Add a `check-in-needed tag to the top most revision

Per Sunsetting “Check-in Needed” announced on dev-platform, it's time to retire the check-in-needed option.

Assignee: nobody → zeid
Keywords: conduit-triaged
Priority: -- → P3
Assignee: zeid → nobody

The check-in-needed workflow was sunsetted some time ago, but
moz-phab still has a check-in-needed argument that sets the
associated Phabricator project on the revision. Remove the argument
and associated code.

We also update the project checking test to look for the
release-managers project since that is more relevant.

Assignee: nobody → sheehan
Status: NEW → ASSIGNED
Status: ASSIGNED → RESOLVED
Closed: 6 months ago
Resolution: --- → FIXED
You need to log in before you can comment on or make changes to this bug.

Attachment

General

Created:
Updated:
Size: