Closed Bug 350218 Opened 18 years ago Closed 16 years ago

"Hide completed tasks" should work for main view like for tasks panel

Categories

(Calendar :: Calendar Frontend, enhancement)

enhancement
Not set
normal

Tracking

(Not tracked)

VERIFIED FIXED

People

(Reporter: damian.publicemail, Assigned: Taraman)

Details

User-Agent:       Mozilla/5.0 (Windows; U; Windows NT 5.1; pl; rv:1.8.0.6) Gecko/20060728 Firefox/1.5.0.6
Build Identifier: Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.9a1) Gecko/20060824 Calendar/0.3a2+

it will be nice if completed tasks will be hidden in main view if Hide completed tasks is checked
right now it works only for tasks panel

if it does not make sense to keep them visible in tasks panel why it dones in main view?

Reproducible: Always

Steps to Reproduce:
1. create task
2. check it as completed
3. check in task panel "Hide complted tasks"

Actual Results:  
tasks are not visible in tasks panel but they are in main view (if you checked "Tasks in view")

Expected Results:  
completed tasks are not visible in main view
Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.9a1) Gecko/20061030 Calendar/0.4a1

stil can be reproduce
Status: UNCONFIRMED → NEW
Ever confirmed: true
Summary: hide completed tasks should work for main view like for tasks panel → "Hide completed tasks" should work for main view like for tasks panel
Status: NEW → ASSIGNED
Assignee: nobody → MarkusAdrario
Status: ASSIGNED → NEW
Status: NEW → ASSIGNED
I confirm
new to this calendar, so don't know if a separate control option is needed to hide completed tasks from the calendar view, independent of the task list.

I suppose at a minimum, the existing [Hide] completed tasks could be expanded to include the calendar view too.
I think the "Hide/Show completed tasks" control should be separate for the task list and the calendar view. (see http://wiki.mozilla.org/Calendar:Thunderbird_Menu_Integration)

Christian, have you already decided on this part of the UI?
OS: Windows XP → All
Hardware: PC → All
No, I have not decided on the part, and I'd like to shift the decision until we start working on the task mode (Planned for 0.9). This prevents us from doing unnecessary rework.
In fact "hide completed task" should be an option in the new task mode
In fact that was an idea I had in mind for another bugreport when this one is done. :-)
Should be closed thanks to bug 411497, IMHO 
With checkin of Bug 386596 this issue is fixed.
Also comment #3 is incorporated in that.

Therefore changing status to FIXED
Status: ASSIGNED → RESOLVED
Closed: 16 years ago
Resolution: --- → FIXED
Status: RESOLVED → VERIFIED
Target Milestone: --- → 0.9
You need to log in before you can comment on or make changes to this bug.