Closed Bug 368405 Opened 18 years ago Closed 17 years ago

'ERROR: No Value' shown in ics file after converting task to event

Categories

(Calendar :: Internal Components, defect)

x86
Windows 2000
defect
Not set
normal

Tracking

(Not tracked)

RESOLVED WORKSFORME

People

(Reporter: ssitter, Unassigned)

References

()

Details

Attachments

(1 file)

Mozilla/5.0 (Windows; U; Windows NT 5.0; en-US; rv:1.8.1.2pre) Gecko/20070126 Calendar/0.4a1 Steps to Reproduce: 1. Create a new task with a due date and save it 2. Open task for editing 3. Use the dropdown menu to convert from task to event and save it 4. Export to iCalendar format and examine .ics file Actual Results: Content of .ics file shows: BEGIN:VEVENT ... DUE:ERROR: No Value COMPLETED:ERROR: No Value END:VEVENT Expected Results: There should be no errors in .ics file.
Do we have a regression range on this, or has it always been this way? Is it a branch vs. trunk thing? (I'm doubting all of this. I bet it's just something where we're not changing from endDate to dueDate and stuff, and we never saw it while the Event <-> Task menu was disabled.)
Blocks: 392091
Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.8.1.13pre) Gecko/2008022007 Calendar/0.8pre WORKSFORME now with the new dialog and the changed conversion handling.
Status: NEW → RESOLVED
Closed: 17 years ago
Resolution: --- → WORKSFORME
You need to log in before you can comment on or make changes to this bug.

Attachment

General

Created:
Updated:
Size: