Closed
Bug 368405
Opened 18 years ago
Closed 17 years ago
'ERROR: No Value' shown in ics file after converting task to event
Categories
(Calendar :: Internal Components, defect)
Tracking
(Not tracked)
RESOLVED
WORKSFORME
People
(Reporter: ssitter, Unassigned)
References
()
Details
Attachments
(1 file)
941 bytes,
text/plain
|
Details |
Mozilla/5.0 (Windows; U; Windows NT 5.0; en-US; rv:1.8.1.2pre) Gecko/20070126 Calendar/0.4a1
Steps to Reproduce:
1. Create a new task with a due date and save it
2. Open task for editing
3. Use the dropdown menu to convert from task to event and save it
4. Export to iCalendar format and examine .ics file
Actual Results: Content of .ics file shows:
BEGIN:VEVENT
...
DUE:ERROR: No Value
COMPLETED:ERROR: No Value
END:VEVENT
Expected Results:
There should be no errors in .ics file.
Comment 1•18 years ago
|
||
Do we have a regression range on this, or has it always been this way? Is it a branch vs. trunk thing?
(I'm doubting all of this. I bet it's just something where we're not changing from endDate to dueDate and stuff, and we never saw it while the Event <-> Task menu was disabled.)
Reporter | ||
Comment 2•17 years ago
|
||
Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.8.1.13pre) Gecko/2008022007 Calendar/0.8pre
WORKSFORME now with the new dialog and the changed conversion handling.
Status: NEW → RESOLVED
Closed: 17 years ago
Resolution: --- → WORKSFORME
You need to log in
before you can comment on or make changes to this bug.
Description
•