Closed
Bug 619486
Opened 14 years ago
Closed 14 years ago
Changing Start date changes Due date to same value
Categories
(Calendar :: Lightning Only, defect)
Tracking
(Not tracked)
RESOLVED
INVALID
People
(Reporter: mozilla, Unassigned)
Details
User-Agent: Mozilla/5.0 (X11; U; Linux i686; en-US; rv:1.9.2.13) Gecko/20101206 Ubuntu/10.10 (maverick) Firefox/3.6.13
Build Identifier: Lightning 2010-12-14 (latest-comm-1.9.2) / Thunderbird 3.1.7 / Ubuntu 10.10
In the Edit Task dialog, when I change the Start date the Due date becomes the same as the Start date. And vice versa.
Reproducible with a clean profile. No errors in the error console.
Reproducible: Always
Steps to Reproduce:
1) Double click on the task list in the today pane to create a new task.
2) Click on the checkbox for Start date then Due date.
3) Click on the drop-down button of either the Start or Due date.
4) Click on a day
Actual Results:
Both dates change to the same day.
Expected Results:
The dates should be independent of each other.
What is that thing on the far right that connects the two time fields? Is that somehow binding the two dates together?
Reporter | ||
Comment 1•14 years ago
|
||
Figures, right after I report the "bug" I discover it's user error. That "binder thing" on the right of the two time fields somehow was set in Bind Mode.
Status: UNCONFIRMED → RESOLVED
Closed: 14 years ago
Resolution: --- → INVALID
You need to log in
before you can comment on or make changes to this bug.
Description
•