Coordinating move and racking of Services C7K from MTV1 to PHX1

Categories

(Infrastructure & Operations :: DCOps, task)

x86
macOS
task
Not set
normal

Tracking

(Not tracked)

RESOLVED FIXED

People

(Reporter: jlaz, Unassigned)

Details

(Whiteboard: need PO for new 3120X switches)

We've completed the decommissioning process for the Services Dev MTV1 hardware, and would like to move our HP C7K (vm3.mtv1.svc.mozilla.com) to PHX1. All other legacy hardware (iX/Supermicro) that is currently racked can be re-purposed for Infra or donated. We'd like to rack the c7k in the general infra area (not Services BU) where we can access other Services infra. Inventory link: https://inventory.mozilla.org/en-US/systems/show/6858/ There are 4 full-sized blades, with 4 accompanying half-height storage blades within this chassis. Thanks in advance!
Thanks for the heads-up, :jlaz With the company shutdown coming up, we might need to make special arrangements if you need this in PHX1 before the end of the year. Do you have a target date for your move?
No need to have it done by the end of the year at all, but if something can work in January, that would be awesome :)
colo-trip: --- → mtv1
Whiteboard: MTV1 to PHX1
C7k picked up by Moving Solutions, they will let us know when it arrives in phx1.
C7k is racked, accessible via console and oob. I believe we still need to finish up the switch config.
colo-trip: mtv1 → phx1
the current switch in the c7k enclosure doesnt support 10G. contacted Rich to quote us on 2x 3120X. cisco WS-CBS3120G-S (PowerPC405) processor (revision D0) with 262144K bytes of memory. Processor board ID FOC1327T05T Last reset from power-on 1 Virtual Ethernet interface 1 FastEthernet interface 52 Gigabit Ethernet interfaces The password-recovery mechanism is enabled. http://www.cisco.com/en/US/prod/collateral/switches/ps6746/ps8742/ps8749/data_sheet_c78-439133.html
I think we'll need a PO. Van The switches are $9,995 each so $19,990 for two. Lead time is 2-3 weeks Regards, Rich 617 308 9117
Flags: needinfo?(jlaz)
Whiteboard: MTV1 to PHX1 → need PO for new 3120X switches
Let's setup the 1G connect for now. ckolos and mmayo will figure out our options for the 10G switches, as this is an unplanned expense Much appreciated guys!
Flags: needinfo?(jlaz)
we'll get it configured next trip then. we'll need to grab 2x 1GB-SR SFPs from scl3 for the 4500.
This machine is up. We swapped out two 10G switches from another spare c7000 we had in scl3 (will update with asset tag later) please confirm and close bug, let us know if you need anything else.
this c7k is up on 10gig switches. let us know if there are any issues. https://inventory.mozilla.org/en-US/systems/racks/?site=12&status=&rack=333&allocation=
Status: NEW → RESOLVED
Closed: 11 years ago
Resolution: --- → FIXED
FYI, we took the 2x 10gig switches from https://inventory.mozilla.org/en-US/systems/show/5366/