Open Bug 2080698 Opened 9 days ago Updated 2 days ago

Certigna: Failure to announce completion of action item within prescribed time period

Categories

(CA Program :: CA Certificate Compliance, task)

Tracking

(Not tracked)

ASSIGNED

People

(Reporter: j.allemandou, Assigned: j.allemandou)

Details

(Whiteboard: [ca-compliance] [policy-failure])

Preliminary Incident Report

  • Incident description: Bug 2076795 included an action item with a due date of 2026-10-02. We met that action item by the due date but failed to report it within three days of completion as required by CCADB Incident Reporting Guidelines.
  • Relevant policies: CCADB Incident Reporting Guidelines v3.2.
  • Source of incident disclosure: Third party reported by adding a comment to the bug report.
Assignee: nobody → j.allemandou
Status: UNCONFIRMED → ASSIGNED
Ever confirmed: true
Whiteboard: [ca-compliance] [policy-failure]

Full Incident Report

Summary

  • CA Owner CCADB unique ID: A000011
  • Incident description: Bug 2076795 included an action item with a due date of 2026-10-02. We met that action item by the due date but failed to report it within three days of completion as required by CCADB Incident Reporting Guidelines.
  • Timeline summary:
    • Non-compliance start date: 2026-10-05
    • Non-compliance identified date: 2026-10-09
    • Non-compliance end date: 2026-10-19
  • Relevant policies: CCADB Incident Reporting Guidelines v3.2.
  • Source of incident disclosure: Third party reported by adding a comment to the bug report.

Impact

  • Total number of certificates: N/A
  • Total number of "remaining valid" certificates: N/A
  • Affected certificate types: N/A
  • Incident heuristic: No, as no certificates had been affected.
  • Was issuance stopped in response to this incident, and why or why not?: No
  • Analysis: N/A
  • Additional considerations: N/A

Timeline

2025-07-15 : CCADB Incident Reporting Guidelines version 3.1 is published, specifying that Action Item updates are due within three days of change, completion, or delay.
2026-09-30 : Bug 2076795 has been created with an action plan, and the final action is scheduled for October 2, 2026.
2026-10-05: Deadline for updating the ticket to confirm that the planned actions have been implemented.
2026-10-07: The bug report has been updated to confirm that all actions were implemented.
2026-10-09 : A comment reminds us that we were supposed to update the ticket within 3 days of implementing the actions.
2026-10-19: Update of our corrective action management procedures, considering the 3-day update deadline.
2026-10-19: Raising staff awareness of the procedures.

Related Incidents

Bug Date Description
Bug 2077508 2026-10-02 Sectigo: Failure to announce completion of action item within prescribed time period
Bug 2021175 2026-03-04 Microsoft PKI Services: Failure to update action item status within 3 days

Root Cause Analysis

Contributing Factor #: title The guidelines for managing corrective actions have not been updated

  • Description: Our procedures for managing corrective actions were not updated in 2025 to reflect changes in the CCADB Incident Reporting Guidelines regarding the delay in updating a ticket after an action has been processed. These procedures are separate from those used for incident reporting or non-conformities management.
  • Timeline: 2025-07-15 – 2026-10-19
  • Detection: Third-party reported
  • Interaction with other factors: N/A
  • Root Cause Analysis methodology used: 5-Whys

Lessons Learned

  • What went well: The corrections were made promptly after the report, with no impact on our services.
  • What didn’t go well: We failed to provide the status update according to specified timelines.
  • Where we got lucky: N/A
  • Additional: N/A

Action Items

Action Item Kind Corresponding Root Cause(s) Evaluation Criteria Due Date Status
The bug report has been updated to confirm that all actions were implemented Mitigate Root Cause # 1 Bug updated with the status of corrective actions 2026-10-07 Complete
Update of corrective action management procedures, considering the 3-day update deadline Prevent Root Cause # 1 Should reduce the occurrence of this type of non-compliance 2026-10-19 Complete
Raising staff awareness of the procedures Prevent Root Cause # 1 Should reduce the occurrence of this type of non-compliance 2026-10-19 Complete
You need to log in before you can comment on or make changes to this bug.