Summary
- Incident description:
certSIGN had an open bug, 2085384, certSIGN: OCSP with bad KeyUsage, that required the revocation of the ROOT CA G2 OCSP and reissuing it. When planning and preparing for the revocation, the team checked the ROOT CA G2 CRL and found a small difference on the validity of the root CRL that was non-conformant. Checking also the CRLs for the other roots they found that also the ROOT CA G4 CRL have a difference of 1 extra second against the 12 month limit for the validity conform CA/Browser BR.
- Relevant policies:
Common CA Database - Incident Reporting Guidelines version 3.2;
CA/Browser ForumBaseline Requirements v2.3.1 Section 7.2 - Table 88: CRL Fields.;
- Source of incident disclosure:
certSIGN internal monitoring process at 2026-10-27 7:00 UTC
Updated•1 month ago
|
| Assignee | ||
Comment 1•26 days ago
|
||
Full Incident Report
Summary
-
CA Owner CCADB unique ID: A000013
-
Incident description:
certSIGN had an open bug, 2085384, certSIGN: OCSP with bad KeyUsage, that required the revocation of the ROOT CA G2 OCSP and reissuing it. When planning and preparing for the revocation, the team checked the ROOT CA G2 CRL and found a small difference on the validity of the root CRL that was non-conformant. Checking also the CRLs for the other roots they found that also the ROOT CA G4 CRL have a difference of 1 extra second against the 12 month limit for the validity conform CA/Browser BR. -
Timeline summary:
- Non-compliance start date: 2026-10-21 11:24 UTC
- Non-compliance identified date: 2026-10-27 8:00 UTC
- Non-compliance end date: 2026-10-27 12:43 UTC
- Relevant policies:
Common CA Database - Incident Reporting Guidelines version 3.2
certSIGN Web CA G2 Certification Practice Statement - version 1.2 (2026-10-20);
certSIGN Web CA G4 - Certification Practice Statement – version 1.6 (2026-10-21);
CA/Browser ForumBaseline Requirements v2.3.1 Section 4.9.5
- Source of incident disclosure:
certSIGN internal monitoring process at 2026-10-27 8:00 UTC
### Impact
-
Total number of certificates: 2
-
Total number of "remaining valid" certificates: 0
-
Affected certificate types:
Root Certificates Revocation List -
Incident heuristic:
Only the ROOT CRLs that were created during a ceremony were affected. -
Was issuance stopped in response to this incident, and why or why not?:
No, this event did not affect the issuance of any other certificates.
- Analysis:
Setting the valability of the CRL with a larger interval before the limit was recommended, but not enforced.
- Additional considerations:
N/A
Timeline
2026-10-21 11:24 UTC – ceremony to replace the root CRLs, that generated the bad validity
2026-10-27 08:00 UTC – planning and preparing for fixing the bug 2085384, certSIGN: OCSP with bad KeyUsage, that required a revocation and the update of the ROOT CA G2 CRL, identified the validity issue of the existing CRL.
2026-10-27 08:30 UTC – check if the same issue appears in other CRLs and identified it on the certSIGN ROOT CA G4 CRL
2026-10-27 09:00 UTC – get approvals to update the ceremony to include fixing the validity issue on both ROOT CRLs
2026-10-27 12:00 UTC – ceremony for fixing the initial bug on the ROOT OCSP and the two affected ROOT CRLs
2026-10-27 12:43 UTC – Incident ended with the ROOT CRLs replaced
Related Incidents
| Bug | Date | Description |
|---|---|---|
| 2085384 | 2026-10-23 | The analysis and preparation for fixing this bug reveals the current bug |
Root Cause Analysis
Contributing Factor #1: Bad time reference during the ceremony
-
Description:
The process of issuing the new CRL was relying on the time on the Root server, and during the ceremony the operator selected the time from the workstation, that was miss-aligned. -
Timeline:
2026-10-21 11:24 UTC – ceremony to replace the root CRLs, that generated the bad validity
2026-10-27 08:00 UTC – identified the validity issue of the existing CRL
-
Detection:
Through certSIGN internal analysis process -
Interaction with other factors:
Missalignment between the time of the server and workstation. -
Root Cause Analysis methodology used:
5 Whys
Contributing Factor #2: root CRL validation not performed correctly
-
Description:
During and after the ceremony the CRL validation did not detect the validity issue. -
Timeline:
2026-10-21 11:24 UTC – ceremony to replace the root CRLs, that generated the bad validity
2026-10-27 08:00 UTC – identified the validity issue of the existing CRL
-
Detection:
Through certSIGN internal analysis process -
Interaction with other factors:
The validation process did not included root CRLs, except for manual validation during the ceremony -
Root Cause Analysis methodology used:
5 Whys
Lessons Learned
- What went well:
• The process was quickly finalized.
- What didn’t go well:
• The operator did not observed the problem during first ceremony
• The validation of the root CRL was incorect/incomplete
- Where we got lucky:
• There was no impact on clients/subscribers due to this issue.
- Additional:
N/A
Action Items
| Action Item | Kind | Corresponding Root Cause(s) | Evaluation Criteria | Due Date | Status |
|---|---|---|---|---|---|
| Replace the ROOT CRLs | Correct | Contributing Factor #1 & #2 | CRLs validation report | 2026-10-27 | Completed |
| Synchonize the time on container devices | Correct | Contributing Factor #1 | Internal Report | 2026-10-27 | Completed |
| Update the procedures for CRL validation | Prevent | Contributing Factor #2 | Procedure approval by top management | 2026-10-30 | In Progress |
| Training on the updated process with all the personnel involved | Prevent | Contributing Factor #1 | Training report | 2026-12-31 | Proposed |
Appendix
root_g2-27oct2026.crl https://crl.certsign.ro/certsign-rootg2.crl?_gl=1*1ala84i*_gcl_au*MTA1NTI4MjcwMy4xNzg3MTQxODU0
root_g4-27oct2026.crl https://pkipro.certsign.ro/certSIGNRootCAG4.crl?_gl=1*1sxh51h*_gcl_au*MTA1NTI4MjcwMy4xNzg3MTQxODU0
| Assignee | ||
Comment 2•23 days ago
|
||
Task Item "Update the procedures for CRL validation" was "Completed"
Task Item "Training on the updated process with all the personnel involved" is "Ongoing"
| Assignee | ||
Comment 3•16 days ago
|
||
Task Item "Training on the updated process with all the personnel involved" is "Ongoing"
| Assignee | ||
Comment 4•11 days ago
|
||
Task Item "Training on the updated process with all the personnel involved" was "Completed"
| Assignee | ||
Comment 5•10 days ago
|
||
Report Closure Summary
- Incident description:
certSIGN had an open bug, 2085384, certSIGN: OCSP with bad KeyUsage, that required the revocation of the ROOT CA G2 OCSP and reissuing it. When planning and preparing for the revocation, the team checked the ROOT CA G2 CRL and found a small difference on the validity of the root CRL that was non-conformant. Checking also the CRLs for the other roots they found that also the ROOT CA G4 CRL have a difference of 1 extra second against the 12 month limit for the validity conform CA/Browser BR.
- Incident Root Cause(s):
Contributing Factor #1: Bad time reference during the ceremony
The process of issuing the new CRL was relying on the time on the Root server, and during the ceremony the operator selected the time from the workstation, that was miss-aligned.
Contributing Factor #2: root CRL validation not performed correctly
During and after the ceremony the CRL validation did not detect the validity issue.
- Remediation description:
The ROT CRL was updated with the correct reason, the devices in the container had been synchronized. The procedure for CRL validation was updated, reviewed, and approved. Then a training had been performed with all the System Administrators involved in the CRL updates process.
- Commitment summary:
certSIGN remains committed to improve the procedures, instructions and training of the personnel involved in certificate issuance, besides the periodic planned periods.
All Action Items disclosed in this report have been completed as described, and we request its closure.
Comment 6•10 days ago
|
||
This is a final call for comments or questions on this Incident Report.
Otherwise, it will be closed on approximately 2026-11-25.
| Assignee | ||
Comment 7•3 days ago
|
||
All Action Items have been completed and we request ticket closure.
Updated•3 days ago
|