Closed
Bug 2091021
Opened 17 days ago
Closed 17 days ago
Do not schedule non required test tasks on enterprise
Categories
(Enterprise Products :: General, task)
Enterprise Products
General
Tracking
(Not tracked)
RESOLVED
FIXED
People
(Reporter: gerard-majax, Assigned: gerard-majax)
References
Details
Attachments
(2 external files)
After giving a check with Claude:
Tasks per enterprise-t worker type, enterprise-main, last 4 weeks
Of the 76 pushes, 70 have a Firefox decision graph (the 6 busted ones are missing) and all 76 have a Thunderbird one. The figures are typical counts per push.
taskgraph.decision (Firefox)
┌──────────────────────────────┬──────────────┬─────────────┬────────────┬────────────────────────────────────────────┐
│ Worker type │ Before 10-16 │ 10-16 → now │ Merge push │ Main kinds now │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ win11-64-25h2 │ ~202 │ 272–280 │ 278–288 │ mochitest 163, wpt 72, test 38 │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ t-linux-docker-noscratch-amd │ 152 │ 233–239 │ 238–244 │ mochitest 128, wpt 69, test 19, reftest 18 │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ t-linux-docker-kvm │ ~64 │ 197–237 │ 217–239 │ wpt 129, mochitest 46, test 16, reftest 9 │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ win11-64-25h2-gpu │ 7 │ 57–61 │ 57–59 │ reftest 44, wpt 10, mochitest 7 │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ t-linux-2204-wayland │ 24 │ 24–25 │ 29–30 │ mochitest 22 │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ t-linux-xlarge-2204-wayland │ 0 │ 19–21 │ 19–21 │ wpt 21 │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ win10-64-2009 │ 15 │ 13–15 │ 13–15 │ │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ win11-64-25h2-webgpu │ 0 │ 14 │ 14 │ │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ t-linux-docker-amd │ 6–18 │ 5–20 │ 51–89 │ source-test only │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ t-linux-docker-16c32gb-amd │ 7 │ 7 │ 7 │ │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ win10-64-2009-gpu │ 2 │ 2 │ 2 │ │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ win11-64-25h2-source │ 0 │ 0–1 │ 3–10 │ │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ misc │ 0–1 │ 0–2 │ 12–535 │ kind misc │
├──────────────────────────────┼──────────────┼─────────────┼────────────┼────────────────────────────────────────────┤
│ enterprise-t total │ ~485 │ ~860–935 │ 963–1525 │ │
└──────────────────────────────┴──────────────┴─────────────┴────────────┴────────────────────────────────────────────┘
- Normal pushes have used about 1.8× more enterprise-t tasks since 2026-10-16 (about 485 → about 870). Web-platform-tests and reftest started running across most platforms that day. The largest increases are t-linux-docker-kvm (64 → about 200, mostly 120–129 wpt tasks), t-linux-docker-noscratch-amd (+87), win11-64-25h2 (+75) and win11-64-25h2-gpu (+50). t-linux-xlarge-2204-wayland and win11-64-25h2-webgpu first appear the same day.
- On merge pushes the extra load is almost all misc and t-linux-docker-amd. misc goes from 0 to as many as 535 tasks: 529 on 10-29, 535 on 10-31 and 486 on 11-04. Some merges add very few (12–72 on 10-19, 10-20, 10-22, 10-21, 11-02, 11-03, 11-05 and 11-06), so this probably depends on what each merge touches. t-linux-docker-amd jumps to 51–89 tasks, all of them source-test. The test worker types barely change between a merge and a normal push.
- t-linux-docker-kvm drifts more than the others between pushes: 197 on 10-16, 219–239 from 10-17 to 11-05, and back to 199–200 from 11-06.
- Three small graphs (ef934efbe94c, 6f3b9f9bda17, fd2080dc050d) schedule only 34–37 enterprise-t tasks, and none on the test-heavy types.
Comment 2•17 days ago
|
||
(via GitHub webhook, authenticated as shared-secret)
Comment 3•17 days ago
|
||
(via GitHub webhook, authenticated as shared-secret)
Comment 4•17 days ago
|
||
Authored by Alexandre Lissy
https://github.com/mozilla/enterprise-firefox/commit/951f4f9ea1684c735dff2bcf372c06a474afc6ff
[enterprise-main] Bug 2091021 - Do not schedule non required test tasks on enterprise
Authored by https://github.com/jonathanmendez
https://github.com/mozilla/enterprise-firefox/commit/0c5d727d4c3062937f546601017ecef80b59613c
[enterprise-main] Merge pull request #1792 from lissyx/enterprise-bug2091021_skip_wpt_reftest
(via GitHub webhook, authenticated as shared-secret)
Status: NEW → RESOLVED
Closed: 17 days ago
Resolution: --- → FIXED
Updated•15 days ago
|
Flags: qe-verify-
You need to log in
before you can comment on or make changes to this bug.
Description
•