Open Bug 2092715 Opened 15 days ago Updated 15 days ago

NETLOCK: 2026 audit statements for NetLock Arany (Class Gold) Főtanúsítvány not filed in CCADB on time

Categories

(CA Program :: CA Certificate Compliance, task)

Tracking

(Not tracked)

ASSIGNED

People

(Reporter: andras.somkuti, Assigned: andras.somkuti)

Details

(Whiteboard: [ca-compliance] [audit-delay])

Preliminary Incident Report

Summary

  • CA Owner CCADB unique ID: A000039
  • Incident description: Our auditor MATRIX Ltd. audited NetLock Arany (Class Gold) Főtanúsítvány, NetLock Platina (Class Platinum) Főtanúsítvány and NETLOCK Root ECC CA for the period 2025-07-30 to 2026-07-29 and published four attestation letters on 2026-07-24 (E-NL26T1_AAL-01 TLS-BR, -02 TLS-EV, -03 STANDARD, -04 SMIME-BR; https://matrix-tanusito.hu/wp-content/uploads/2026/07/).
    We opened CCADB case 00003367 on 2026-07-24 and entered the four letters, but the case was never submitted to the root stores. The audit period entered in the case did not match the letters. The letters' actual period cannot be entered in CCADB, because each letter is dated before the end of the period it covers (statement date 2026-07-24, period end 2026-07-29).
    The staff member responsible mistakenly believed the filing had been completed, so it was neither checked nor followed up. That is not an excuse; we had no check that a filing had actually reached the root stores. We did not notice that the audit statements were missing, did not ask the auditor for corrected letters, and did not report the delay. The 2026-10-29 deadline (92 days after the period end) passed. This was pointed out in Bug 2052541 Comment 18 on 2026-10-25. Our reply in that bug the same day (Comment 19) did not address it.
    The letters have two further defects: the period starts 2025-07-30, while the previous letters (IT-NL25T1_AAL-01…04) end 2025-07-23, so 2025-07-24 to 2025-07-29 is not covered; and two incidents open during the period, Bugs 1947691 and 1979287, are not in their incident lists.
  • Timeline summary:
    • Non-compliance start date: 2025-07-24 (gap in audit coverage); 2026-10-30 (audit statement not filed within 92 days)
    • Non-compliance identified date: 2026-10-25 (Bug 2052541 Comment 18)
    • Non-compliance end date: ongoing; ends when corrected letters are filed and accepted in CCADB
  • Relevant policies: Mozilla Root Store Policy 3.1, section 3.1 (audits: annual, contiguous periods, statements provided on time); CCADB Policy, section 5 (audit statement delivery within 92 days of the period end).
  • Source of incident disclosure: Third Party Reported (Bug 2052541 Comment 18).

Next steps

  • 2026-11-16: we ask MATRIX for corrected letters: a statement date on or after the period end, a period starting 2025-07-24, and Bugs 1947691 and 1979287 added to the incident lists.
  • By 2026-11-18: we post MATRIX's delivery date in this bug.
  • Within 2 working days of receipt: we file the corrected letters in CCADB case 00003367.
  • Full Incident Report within 14 days.
Assignee: nobody → andras.somkuti
Status: UNCONFIRMED → ASSIGNED
Type: defect → task
Ever confirmed: true
Whiteboard: [ca-compliance] [audit-delay]
You need to log in before you can comment on or make changes to this bug.