Closed Bug 609986 Opened 14 years ago Closed 13 years ago

Allow for the start/end date to be user driven in orange factor

Categories

(Tree Management Graveyard :: OrangeFactor, defect, P1)

defect

Tracking

(Not tracked)

RESOLVED FIXED

People

(Reporter: jmaher, Unassigned)

Details

(Whiteboard: [view:Simulator])

Attachments

(1 file)

The orange factor site either gives you displays based on all data, or one specific day.  It would be nice to set a start/end date from some simple UI and do all calculations, graphs, displays based on that custom date range.
Probably use one of the many (free) JS calendars to do this.
OS: Linux → All
Hardware: x86 → All
After triage, it was decided to remove the existing calendars on the left hand side.  Instead, the menu navigation (bug 619826) should be used to navigate to the appropriate views.  Within a view that contains a date range, clicking on either end of the range should pop open a (JS) calendar that allows date selection.

I believe Mark mentioned one he was familiar with?
Whiteboard: [view:Simulator]
I'll probably do this with bug 620045.
Assignee: nobody → mcote
Status: NEW → ASSIGNED
Done with my patch for bug 620045.  I'll leave this open until we're satisfied, as the UI probably needs a bit of tweaking.
Change to two separate icons for start/end.
Priority: -- → P1
Attachment #501776 - Flags: review?(jmaher)
Comment on attachment 501776 [details] [diff] [review]
Use separate start- and end-date pickers

cool!
Attachment #501776 - Flags: review?(jmaher) → review+
Pushed as http://hg.mozilla.org/automation/orangefactor/rev/0dadd4b0ed99
Status: ASSIGNED → RESOLVED
Closed: 13 years ago
Resolution: --- → FIXED
Product: Testing → Tree Management
Product: Tree Management → Tree Management Graveyard
You need to log in before you can comment on or make changes to this bug.

Attachment

General

Created:
Updated:
Size: