Set up lightning Mac build slave in MPT

RESOLVED FIXED

Status

Mozilla Messaging
Release Engineering
--
major
RESOLVED FIXED
7 years ago
7 years ago

People

(Reporter: jhopkins, Assigned: gozer)

Tracking

Firefox Tracking Flags

(Not tracked)

Details

(Reporter)

Description

7 years ago
tb2-darwin10-slave64 needs to be configured as a lightning mac build slave and tested, preferably sometime early on the week of September 3rd to avoid downtime.
(Assignee)

Comment 1

7 years ago
Main thing it needs is moving to the calendar VLAN, and a buildbot downgrade to 0.7.
Assignee: nobody → gozer
Status: NEW → ASSIGNED
(Reporter)

Updated

7 years ago
Blocks: 688230
(Reporter)

Updated

7 years ago
Depends on: 688838

Comment 2

7 years ago
(In reply to Philippe M. Chiasson (:gozer) from comment #1)
> Main thing it needs is moving to the calendar VLAN, and a buildbot downgrade
> to 0.7.

Is this going to require IT intervention to move the machine between VLANs? 

Also, are you guys officially supporting Calendar, i.e. does not having this setup qualify as a regression?
(Assignee)

Comment 3

7 years ago
(In reply to Chris Cooper [:coop] from comment #2)
> (In reply to Philippe M. Chiasson (:gozer) from comment #1)
> > Main thing it needs is moving to the calendar VLAN, and a buildbot downgrade
> > to 0.7.
> 
> Is this going to require IT intervention to move the machine between VLANs? 

Nope.

tb2-darwin10-slave64 off the production pool and being calendar-ized
(Assignee)

Comment 4

7 years ago
tb2-darwin10-slave64 imaged and joined the calendar build pool, waiting for builds to cycle through it.
(In reply to Chris Cooper [:coop] from comment #2)
> (In reply to Philippe M. Chiasson (:gozer) from comment #1)

> Also, are you guys officially supporting Calendar, i.e. does not having this
> setup qualify as a regression?

jhopkins, gozer: what are we on the hook to support here?
(Reporter)

Comment 6

7 years ago
We need to continue to support the lightning build slaves that we have set up; to not do so would be a regression.
(Reporter)

Comment 7

7 years ago
new calendar slave is building green
Status: ASSIGNED → RESOLVED
Last Resolved: 7 years ago
Resolution: --- → FIXED
You need to log in before you can comment on or make changes to this bug.