Closed
Bug 373302
Opened 18 years ago
Closed 18 years ago
VEVENT gets doubles in the Agenda List
Categories
(Calendar :: Provider: ICS/WebDAV, defect)
Tracking
(Not tracked)
RESOLVED
DUPLICATE
of bug 352255
People
(Reporter: kaulich, Unassigned)
References
()
Details
User-Agent: Mozilla/5.0 (X11; U; Linux i686; de; rv:1.8.1.2) Gecko/20070220 Firefox/2.0.0.2
Build Identifier: Lightning 0.5pre
I have an egroupware server which exports ics files. For every reload the DTSTAMP of an VEVENT gets updated, no more VEVENTs are created.
In the Agenda list of lightning, for every reload a new line with the title of the event appers.
Reproducible: Always
Steps to Reproduce:
1.create event on server
2.reload
3.reload again
Actual Results:
2 lines in the Agenda list
Expected Results:
1 line in the agenda list
I want to point out that there is still only one VEVENT in the ics file.
WE had some misleading discussion in the german newsgroup about that.
Comment 1•18 years ago
|
||
What Lightning 0.5pre build do you use?
Bug 352255 was fixed yesterday so it should work since the 20070308 build.
| Reporter | ||
Comment 2•18 years ago
|
||
Yes, sorry for the dup, it seems to work with the 20070308 build.
Status: UNCONFIRMED → RESOLVED
Closed: 18 years ago
Resolution: --- → DUPLICATE
Comment 3•18 years ago
|
||
I have also a egroupware server and Lightning connect to this server with a webcal command. And the event are shift in the calendar, the shift is one hour less. For example, event at 15h become an event at 14h.
Moreover, when I put event in the same time that another event, a lot of event appers.
Reproducible: Always
1.create event on server
2.create event on the same time that the precedent event
2.reload
3.reload again
Actual Results:
multiple event and a shift of one hour for all event
Expected Results:
event at the good hour and support 2 event at the same time.
Sincerely
You need to log in
before you can comment on or make changes to this bug.
Description
•