Closed Bug 382363 Opened 19 years ago Closed 2 months ago

"Hide completed tasks" should also hide cancelled tasks (rename to outstanding?)

Categories

(Calendar :: Tasks, enhancement)

Sunbird 0.5
enhancement

Tracking

(Not tracked)

RESOLVED FIXED
152 Branch

People

(Reporter: v.solnicky, Assigned: maxe)

References

Details

Attachments

(1 file)

Rationale: When I do not want to see completed tasks it is as I want to concentrate on tasks that have not been solved yet, that need my attention. Cancelled tasks do not need it, they have already been cancelled so they are similar to the completed ones. So I suggest to make the check-box "Hide completed tasks" hide both completed and cancelled tasks. Having done so it would be worth considering to rename the check box (something like "hide completed/cancelled tasks"?). I see it in Sunbird on both Linux & Windows, but I think it is the same in Lightning. Sunbird 0.5 2007-05-29 on Linux + Sunbird 0.5pre 2007-05-23 on Windows.
With "cancelled", do you mean "completed". Dupe of bug 332193?
Hardware: PC → All
My comment is directed toward lightning: I'm not sure what "mode" the task list in the Today Pane is in, but like he is saying above, it shouldn't include "Cancelled" tasks if "Show Completed Tasks" is not checked. If a task is cancelled, then I shouldn't need to worry about working on it. This goes for the Task Window as well. I'm thinking most of the logic for "Completed" tasks should apply to "Cancelled" tasks as well.
(In reply to comment #2) > With "cancelled", do you mean "completed". Dupe of bug 332193? cancelled means cancelled - you can mark tasks as cancelled. I just marked a task and got briefly confused as my task list view was on "incomplete tasks". Strictly speaking, the view and menu options do the correct thing. What I think would be better would be if they were changed to something like "Outstanding Tasks" so that this could include cancelled tasks.
Flags: tb-integration?
Summary: RFE: "Hide completed tasks" should also hide cancelled tasks → "Hide completed tasks" should also hide cancelled tasks (rename to outstanding?)
Flags: wanted-calendar1.0?
Flags: tb-integration?
Current status (2013-07-04): Sunbird development has been stopped. Lightning 2.4b1 -- shows cancelled tasks as struck through in calendar view, the check-box "Hide completed tasks has been replaced with "Show completed tasks", that does what it says, i.e. formally OK, but the usability has a flow.
Flags: wanted-calendar1.0?
Severity: normal → S3
Duplicate of this bug: 2014712
Duplicate of this bug: 1847992
Assignee: nobody → mozilla
Status: NEW → ASSIGNED

Pushed by kaie@kuix.de:
https://hg.mozilla.org/comm-central/rev/ef22458082dd
Hide cancelled tasks when filtering for incomplete tasks. r=tobyp

Status: ASSIGNED → RESOLVED
Closed: 2 months ago
Resolution: --- → FIXED
Target Milestone: --- → 152 Branch
No longer duplicate of this bug: 1847992
You need to log in before you can comment on or make changes to this bug.

Attachment

General

Created:
Updated:
Size: